HCL20 Assembly

Assembly

Step 9 - continued:

Position the 2x mullions into the unit so that they cover the mitre edges of the mitred panels and are flush with the front of the cabinet. Use glue down the front of the mitre edge and press firmly against the multiple drilled faces of the mullions to firmly bond together. At the top and bottom of the unit are pilot holes for securing the mullions top and bottom - see diagram below. We recommend using hi-lo long screws for fixing the mullions in place.

Pilot holes

Made with FlippingBook. PDF to flipbook with ease